Movie · SpaceX Starship Documentary Series
Critical Path (2026)
- 34m
“The engineering journey to Starship and beyond.”
Overview
Critical Path offers an exclusive, behind-the-scenes look at the engineering marvel that is the SpaceX Starship program. The documentary details the iterative design philosophy, the high-stakes testing, and the relentless drive to build the largest and most powerful rocket ever flown. From the first conceptual sketches to the atmospheric re-entry and landing attempts, this film chronicles the single, complex path of innovation required to make life multi-planetary.
- Starring
- Justin Styer, Elon Musk, Tim Southerton
AI chat
Ask the AI anything about Critical Path
Who's in it
Top Cast
You might also like
Movies like Critical Path
7.8
Movie
Interstellar: Nolan's Odyssey
7.8
Movie
Titanic: The Digital Resurrection
7.4
Movie
The Director and the Jedi
7.9
Movie
The Skywalker Legacy
6.8
Movie
The Fountainhead
6.9
Movie
Battlestar Galactica
7.6
Movie
The Corporation
6.2
Movie
Mariah Carey's Magical Christmas Special
7.1
Movie
What We Left Behind: Looking Back at Star Trek: Deep Space Nine
7.0
Movie
Sunshine
8.4
Movie
David Attenborough: A Life on Our Planet
7.1
Movie
Secrets of the Force Awakens: A Cinematic Journey
6.2
Movie
12:01
6.9
Movie
Last Breath
7.4
Movie
Star Trek
6.9
Movie
Symbiopsychotaxiplasm: Take One
6.7
Movie
Cloverfield
6.3
Movie