فلم · SpaceX Starship Documentary Series
Critical Path (2026)
- 34 منٹ
خلاصہ
Critical Path offers an exclusive, behind-the-scenes look at the engineering marvel that is the SpaceX Starship program. The documentary details the iterative design philosophy, the high-stakes testing, and the relentless drive to build the largest and most powerful rocket ever flown. From the first conceptual sketches to the atmospheric re-entry and landing attempts, this film chronicles the single, complex path of innovation required to make life multi-planetary.
- مرکزی کردار
- Justin Styer, ایلون مسک, Tim Southerton
AI چیٹ
Critical Path کے بارے میں ask2cinemadb سے کچھ بھی پوچھیں
اس میں کون کون ہے
اہم کاسٹ
آپ کو یہ بھی پسند آ سکتا ہے
Critical Path جیسی فلمیں
7.8
فلم
Interstellar: Nolan's Odyssey
7.8
فلم
Titanic: The Digital Resurrection
7.6
فلم
The Corporation
6.9
فلم
The Fountainhead
6.2
فلم
Mariah Carey's Magical Christmas Special
6.9
فلم
Battlestar Galactica
7.0
فلم
The Curious Birth of Benjamin Button
8.4
فلم
David Attenborough: A Life on Our Planet
7.9
فلم
The Skywalker Legacy
7.0
فلم
Sunshine
7.4
فلم
Star Trek
6.9
فلم
Last Breath
6.7
فلم
Cloverfield
6.4
فلم
River of Blood
7.2
فلم
Collapse
7.1
فلم
What We Left Behind: Looking Back at Star Trek: Deep Space Nine
6.3
فلم
Elegy
5.9
فلم