Film · SpaceX Starship Documentary Series
Critical Path (2026)
- 34m
Sinopsis
Critical Path offers an exclusive, behind-the-scenes look at the engineering marvel that is the SpaceX Starship program. The documentary details the iterative design philosophy, the high-stakes testing, and the relentless drive to build the largest and most powerful rocket ever flown. From the first conceptual sketches to the atmospheric re-entry and landing attempts, this film chronicles the single, complex path of innovation required to make life multi-planetary.
- Pemeran
- Justin Styer, Elon Musk, Tim Southerton
Obrolan AI
Tanyakan apa saja tentang Critical Path ke ask2cinemadb
Pemeran
Pemeran Utama
Mungkin Anda juga menyukai
Film seperti Critical Path
7.8
Film
Interstellar: Nolan's Odyssey
7.8
Film
Titanic: The Digital Resurrection
7.6
Film
The Corporation
6.9
Film
The Fountainhead
6.2
Film
Mariah Carey's Magical Christmas Special
8.4
Film
David Attenborough: A Life on Our Planet
6.9
Film
Battlestar Galactica
7.0
Film
Sunshine
7.4
Film
Star Trek
7.2
Film
Collapse
6.9
Film
Last Breath
6.7
Film
Cloverfield
6.4
Film
River of Blood
7.0
Film
The Curious Birth of Benjamin Button
7.9
Film
The Skywalker Legacy
6.3
Film
Elegy
5.9
Film
The Core
6.7
Film